YAZU-001/Yazu Design Demo ProjectOperational Framework
Public demo
DDS + CDE + PROGRAMME

Design Deliverables

Control stakeholder DDS commitments, design production, source-platform workflow and approval performance from one register.

Total DDS Deliverables35662927 issued · 639 forecast / outstanding
Deliverables PerformanceDocument Type and Originator are controlled by the main page filters / table selections. No duplicate dropdowns are shown here.

Originator Performance

When an originator is selected, only that originator remains in this table and the register below.

OriginatorTotalPlannedActualABCPendingOverdue
WHL - William Hare Limited (WHL)2541254125221749 (142)282 (23)8111219
FKG - FK Group (FKG)978967371135 (17)144 (12)749596
Facade Systems Ltd25251700008
Architect7761 (1)3 (3)201
MEP Consultant5542 (2)2 (1)001
Structural Engineer5553 (1)1010
Façade Contractor33110002
Façade Consultant22100001
Total3566355529271891 (163)432 (39)90162628

Deliverable Type Status

When a type is selected, only that type remains in this table and the register below.

Deliverable TypeTotalPlannedForecastActualABCPendingOverdue
DR - Drawing (DR)24662455245518401129 (153)391 (29)82124615
CA - Calculations (CA)813813813813707 (6)22 (2)0260
RP - Report (RP)10610610610640020
TS - Technical Submittals (TS)42424242228 (2)380
DN - Design Note (DN)3232323200000
TW - Temporary Works (TW)27272727161010
Unclassified2525251700008
drawing11111194 (3)3 (2)102
SS - Sample Submittal (SS)1010101061300
PR - Programme (PR)666600000
RG - Register (RG)666601000
IP - Inspection and Test Plan (IP)444400000
report44422 (1)0002
schedule444302 (1)101
calculation222210010
DS - Design Statement (DS)222202 (2)000
GU - Guide (GU)222200000
SK - Sketch Drawing (SK)222200000
IM - Information Management (IM)111100000
specification111101 (1)000
Total35663555355529271891 (163)432 (39)90162628

Full-Scope Deliverables — Cumulative

Curve buttons now act as the legend. Projection uses the most recent 4-week issue and approval rates.

3566Total scope
07131426214028533566Dec 24May 25Oct 25Feb 26Jul 26Dec 26
Projected issue completionInsufficient recent progress0.0 docs/week · 639 remaining
Projected approval completionInsufficient recent progress0.0 docs/week · 1243 remaining
2323/2575A+B approved
Reporting cut-off: 25 Oct 2026. Projection: rolling 4-week current rate, not a contractual forecast. Prepublished: planned only. Pending: Awaiting Design Review only. A/B carry-forward: a previous A or B remains effective while a later revision is under review; C does not carry forward.

Package DDS Control

Every package remains visible. DDS files are expected through the configured document-control platform, reviewed by the Tier 1 Design Manager and consolidated only after acceptance.

Primary CDEOracle AconexConnected source · manual Excel retained as fallback
⌕
PackageDDS Owner / OrganisationPlannedAnticipatedCDE ReceivedRevisionStatusCDE SourceConsolidated
ARC · ArchitecturalDesign LeadLead ArchitectDesign Lead18 Aug 202618 Aug 20260d18 Aug 2026Simulated Oracle AconexDDS-03Under ReviewTRN-3764F1ARC_DDS_DDS-03.xlsx3deliverables
FAC · FaçadeFaçade LeadFaçade ConsultantFaçade Lead20 Aug 202622 Aug 2026+2d22 Aug 2026Simulated Oracle AconexDDS-04AcceptedTRN-C8BA33FAC_DDS_DDS-04.xlsx5deliverables
INT · Internal Fit-OutEmma ClarkeProject Design Team—————Not configured—No DDS received0deliverables
MEP · MEPMEP LeadMEP ConsultantMEP Lead25 Aug 202629 Aug 2026+4d—Awaiting Oracle Aconex—DDS OverdueAwaiting DdsManualSynced DDS0deliverables
ROF · Roofing & WaterproofingDaniel WrightProject Design Team—————Not configured—No DDS received0deliverables
STR · StructureStructural LeadStructural EngineerStructural Lead24 Aug 202626 Aug 2026+2d26 Aug 2026Simulated Oracle AconexDDS-02AcceptedTRN-9463FDSTR_DDS_DDS-02.xlsx0deliverables
VTR · Vertical TransportationYousuf NadeemProject Design Team—————Not configured—No DDS received0deliverables