PACKAGE OPERATING CENTRE
Design Packages
Each package is a live workstream moving through Define → Plan → Develop → Coordinate → Assure → Release → Verify → Close.
PACKAGE GATES
Progress is not assumed — gates must be assessed against evidenceLifecycle and release readiness
| Package | Define | Plan | Develop | Coordinate | Assure | Procure | Construct | Verify | Close |
|---|---|---|---|---|---|---|---|---|---|
ARCArchitectural | G1 | G2 | G3 | G4 | G5 | G6P | G6C | G7 | G8 |
FACFaçade | G1 | G2 | G3 | G4 | G5 | G6P | G6C | G7 | G8 |
INTInternal Fit-Out | G1 | G2 | G3 | G4 | G5 | G6P | G6C | G7 | G8 |
MEPMEP | G1 | G2 | G3 | G4 | G5 | G6P | G6C | G7 | G8 |
ROFRoofing & Waterproofing | G1 | G2 | G3 | G4 | G5 | G6P | G6C | G7 | G8 |
STRStructure | G1 | G2 | G3 | G4 | G5 | G6P | G6C | G7 | G8 |
VTRVertical Transportation | G1 | G2 | G3 | G4 | G5 | G6P | G6C | G7 | G8 |
Use the detailed controls below for package ownership, deliverables, actions, risks and reviews. These records now support the lifecycle rather than define it.
Packages7Live design workstreams
At risk4Immediate intervention
Watch0Needs management attention
Overdue outputs835Across all packages
Open actions45 high design risks
| Lead | Status | Reviews | ||||||
|---|---|---|---|---|---|---|---|---|
| ARC | ArchitecturalLead Architect | Design Lead | Active | 77 attention | 22 attention | 11 attention | 1 | At Risk |
| FAC | FaçadeFaçade Consultant | Façade Lead | Active | 983820 attention | 22 attention | 43 attention | 0 | At Risk |
| INT | Internal Fit-OutProject Design Team | Emma Clarke | Active | 0 | 0 | 0 | 0 | Healthy |
| MEP | MEPMEP Consultant | MEP Lead | Active | 55 attention | 0 | 11 attention | 0 | At Risk |
| ROF | Roofing & WaterproofingProject Design Team | Daniel Wright | Active | 0 | 0 | 0 | 0 | Healthy |
| STR | StructureStructural Engineer | Structural Lead | Active | 53 attention | 0 | 0 | 0 | At Risk |
| VTR | Vertical TransportationProject Design Team | Yousuf Nadeem | Active | 0 | 0 | 0 | 0 | Healthy |