YAZU-001/Yazu Design Demo ProjectOperational Framework
Public demo
DESIGN RISK CONTROL

Risks & Issues

Identify exposure, assign ownership, drive mitigation and convert risk responses directly into controlled project actions.

Public demoSign in to edit
Total records6Risks and realised issues
High / critical5Priority exposure
Active issues1Realised events requiring control
Overdue mitigation6Target date passed
Mitigating2Response currently underway
⌕
6 of 6 recordsRisk score = probability × impact · Issues are treated as realised exposure
TypeCategoryPackage
OV-O01RiskStandardisation opportunityStandardising repeat unitised panel families could improve programme efficiency.DesignFAC9MediumSarah Mitchell15 Oct 2026OverdueOpen
OV-R03RiskLouvre performance requirementClient clarification and MEP criteria remain outstanding.CoordinationFAC12HighSarah Mitchell06 Oct 2026OverdueOpen
OV-R02RiskGlass procurement lead timeSelected glass build-up has an extended procurement lead period.ProgrammeFAC16CriticalSarah Mitchell09 Oct 2026OverdueOpen
DR-001RiskFaçade interface information may delay coordinated issueOutstanding interface information could affect package coordination and downstream procurement.ProgrammeARC16CriticalDesign Manager02 Sept 2026OverdueMitigating
OV-R01RiskSteel interface delayStructural interface information may delay façade design release.CoordinationFAC20CriticalSarah Mitchell29 Sept 2026OverdueMitigating
—IssueThe MEP trades are running late-the design need o concludeThe MEP Risk is going crazyCoordinationMEP20CriticalMEP Lead02 Sept 2026OverdueOpen